TABLE OF CONTENTS
7. ENVIRONMENTAL
COMPLAINT AND NON-COMPLIANCE
8. IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURES
FIGURES
Figure 1 Project
General Layout
Figure 2 Air
and Noise Monitoring Locations
LIST OF APPENDICES
Weather and Meteorological Conditions during
Reporting Month |
|
|
|
i.
The Civil Engineering and Development
Department HKSAR has appointed MateriaLab Consultants Limited (MCL) to
undertake the Environmental Team services for the Project and implement the EM&A
works.
ii.
This Monthly EM&A report presents the
environmental monitoring and audit works for the period between 1 December and
31 December 2020. As informed by the Contractor, major activities in the
reporting month were:
Landscape works – irrigation
systems, tree and shrub planting
Breaches of the Action and Limit Levels
iii. One Action Level exceedance for 24-hr TSP
were recorded in the reporting month. An exceedance were recorded at KER1 on 23
December 2020.
iv. One Limit Level exceedance for 24-hr TSP was
recorded in the reporting month. An exceedance was recorded at KTD2c on 29
December 2020.
v. No Action / Limit Level exceedance was
recorded for 24-hr TSP at KTD1 in the reporting month.
vi. One Limit Level exceedance for construction
noise was recorded in the reporting month. An exceedance was recorded at KER1
on 30 December 2020.
vii. No Action / Limit Level exceedance was
recorded for construction noise at KTD1 and KTD2c in the reporting month.
Complaint, Notification of Summons and Successful Prosecution
viii. No environmental complaint, notification of
summons and successful prosecution were received in the reporting month.
Reporting Changes
ix. There was no reporting change in the
reporting month.
Future Key Issues
x. The key issues to be considered in the
coming reporting month include:
Potential environmental
impacts arising from the above construction activities are mainly associated
with construction dust, construction noise, water quality, waste management and
landscape and visual impacts.